When you see a technical operation available for execution on the field widget (the technical operation indicator is painted over with the culture color and is within the current week, and the technical operation icon is colored), you have two options for performing this technical operation:

  1. You can click on the technical operation indicator in the current week and perform the technical operation with the parameters specified at the stage of planning the crop rotation.
  2. You can click on the technical operation icon on the right side of the technical operation line and go to the screen for detailing the costs of adding commodities and materials to this technical operation. This is necessary operation if you want to adjust the costs of commodities and materials in this operation, for example, due to adverse weather conditions or insufficient money for technical operations.

The detail screen for adding commodities and materials during a technical operation contains a slider for changing costs with indicators for the proportional part of the minimum, weighted average, and maximum historical costs, for adding commodities and materials to this technical operation in the selected region. You have already seen similar indicators when detailing costs during crop rotation planning.

Additionally, a blue indicator is displayed - this is the cost level that you selected at the planning stage of the crop rotation.

Changes in costs dynamically affect the gross costs of commodities and materials in this operation and the yield forecast, which, in turn, affects the gross yield forecast.

PRO sessions users can apply technical operations to all fields of the selected culture from the cost detail screen, applying cost calculations to all fields. When switching the mode from selecting parameters for one field or for all fields of culture, the gross costs change dynamically, reflecting the costs for one field or all fields of culture, respectively.

In the left part of the cost detail screen, there is a zone with a description of planned and actually made costs for this type of commodities and materials in the field, to get visual information about the costs that have already been made and still lie ahead.

In the lower part of the cost details screen you will find a map of technical operations for this field, indicating the actual and planned costs for all operations for all types of commodities and materials.

Please note that for winter crops the technical operations map is looped and, for example, being in February on the winter wheat technical operations map, you will see the technical operations of seed, fertilizer and plant protection products in September - meaning preceding year September.

The blue indicator is on the same level as the yellow one. What does it mean?

Most likely, at the planning stage of the crop rotation, you did not change the costs of this type of commodities and materials relative to the weighted average, and your planned cost level coincides with the weighted average.

The cost slider does not move or moves in jerks.

Pay attention to the amount of goods and materials introduced into this commodities and materials operation, probably this introduction with low costs and a minimum change in costs of $ 1 is just this jump of the slider.